|
|
Development
Fees
Building
and Safety | Planning | Engineering | Environmental | School
Building
and Safety
| FEE TYPE |
RESIDENTIAL |
COMMERCIAL |
INDUSTRIAL |
| Bldg Pmt Issuance |
$22.00 Per Permit |
$22.00 Per Permit |
$22.00 Per Permit |
| Bldg Pmt Fees |
'97 UAC Table 3-A |
'97 UAC Table 3-A |
'97 UAC Table 3-A |
| Bldg Plan Check |
65% of Building Permit |
65% of Building Permit |
65% of Building Permit |
| Elect Pmt Issuance |
$23.50 Per Permit |
$23.50 Per Permit |
$23.50 Per Permit |
| Elect Pmt Fees |
'97 UAC Table 3-B |
'97 UAC Table 3-B (+$.04SF/MIN $30) |
'97 UAC Table 3-B (+$.04SF/MIN $30) |
| Elect Pmt Check |
25% of Elect Permit |
25% of Elect Permit |
25% of Elect Permit |
| Mech Pmt Issuance |
$23.50 Per Permit |
$23.50 Per Permit |
$23.50 Per Permit |
| Mech Pmt Fees |
'97 UAC Table 3-C |
'97 UAC Table 3-C (+$.04SF/MIN $30) |
'97 UAC Table 3-C (+$.04SF/MIN $30) |
| Mech Pmt Check |
'97 UAC Table 3-C |
'97 UAC Table 3-C |
'97 UAC Table 3-C |
| Plumb Pmt Issuance |
$23.50 Per Permit |
$23.50 Per Permit |
$23.50 Per Permit |
| Plumb Pmt Fees |
'97 UAC Table 3-D |
'97 UAC Table 3-D (+$.03SF/MIN $30) |
'97 UAC Table 3-D (+$.03SF/MIN $30) |
| Plumb Plan Check |
'97 UAC Table 3-D |
'97 UAC Table 3-D |
'97 UAC Table 3-D |
| State Energy Fees |
$28 Per 1,000SF |
$.04 Per Building SF ($30 MIN) |
$.04 Per Building SF ($30 MIN) |
| SMI (min $.50) |
0.0001 x Valuation of Building |
0.00021 x Valuation of Building |
0.00021 x Valuation of Building |
| Computer Fees |
$.039 Per Building SF |
$.039 Per Building SF |
$.039 Per Building SF |
| Disable Access Fee |
N/A |
$.005 Per Building SQ FT |
$.005 Per Building SQ FT |
| Grading Pmt Issuance |
$23.50 Per Permit |
$23.50 Per Permit |
$23.50 Per Permit |
| Grading Permit |
$75 Per 1st 10,000SF of
Property + $5 Per 1,000SF > than 10,000SF |
$75 Per 1st 10,000SF of
Property + $5 Per 1,000SF > than 10,000SF |
$75 Per 1st 10,000SF of
Property + $5 Per 1,000SF > than 10,000SF |
| Grading Plan Check |
65% of Grading Permit |
65% of Grading Permit |
65% of Grading Permit |
| Archive |
$2 Per Plan Page |
$2 Per Plan Page |
$2 Per Plan Page |
Planning
| FEE TYPE |
RESIDENTIAL |
COMMERCIAL |
INDUSTRIAL |
PUBLIC FACILITIES |
Circulation**
Effective:
02/11/08
Effective:
02/11/09
(pending adoption 12/31/08) |
SFD = $5,232.00 Per Unit
MFD = $3,202.00 Per Unit
SFD=$5,734.00 Per Unit
MFD=$3,509.00 Per Unit |
$7.851/Bldg SF-Comm/Retail
$6.352/Bldg SF-Office
$8.605 /Bldg SF-Comm/Retail
$6.962 /Bldg SF-Office |
$3.202/Bldg SQ FT**
$3.509/Bldg SQ FT**
|
$6.352/Bldg SQ FT
$6.962/Bldg SQ FT |
** The fee for high-cube warehouse development (defined
as warehouse/distribution centers greater than 200,000 sq. ft. in size
with a typical ceiling height of at least 28 feet, employing a high level
of automation, and used primarily for distribution to other warehouses)
shall be 50% of the fee shown for industrial/warehouse development
*** The fee for development types not
listed in this table shall be based on the Institute of Transportation
Engineers (ITE) trip generation rates, or by other trip rate studies deemed
acceptable to the City. |
Landscape
Median |
SFD=$573.20 Per Unit
MFD=$348.51 Per Unit |
$.872/Bldg SF-Comm/Retail
$.698/Bldg SF-Office |
$.348/Bldg SQ FT |
$.698/Bldg SQ FT |
| Public Facilities |
SFD=$796.26 Per Unit
MFD=$358.32 Per Unit |
$.398/Bldg SQ FT |
$.398/Bldg SQ FT |
|
| Police |
SFD=$526.52 Per Unit
MFD=$710.80 Per Unit |
$.526/Bldg SQ FT |
$.131/Bldg SQ FT |
|
| Library |
SFD=$533.30 Per Unit
MFD=$239.99 Per Unit |
$.042/Bldg SQ FT |
$.042/Bldg SQ FT |
|
| Fire Facilities |
$164 per SFD |
$.25 Per Bldg SQ FT |
$.10 Per Bldg SQ FT |
|
| Final Plng Inspection |
$65 Per SFD |
$865 Per Unit |
$865 Per Unit |
|
Planning Plan
Check |
$135 Per Submittal
$65 For Room Add/Alts |
$135 Per Submittal |
$135 Per Submittal |
|
Municipal
Services |
Approx $2,800 Per Unit
Based on Fiscal Analysis |
N/A |
N/A |
|
Engineering
| FEE TYPE |
RESIDENTIAL |
COMMERCIAL |
INDUSTRIAL |
Park Development:
A. SFD
B. Townhomes/Condo
C. Apartments
D. Mobilehomes |
$6,500.00 Per SFD
$5,981.70 Per Unit
$5,139.37 Per Unit
$5,476.44 Per Unit |
N/A |
N/A |
Storm-Drain Fees:*
A. Declez North
B. Declez South
C. Fontana East
D. Upper Etiwanda
E. Middle Etiwanda
F. Lower Etiwanda
G. I-10 North
H. I-10 South
I. I-15 North
J. Projects 3-4
|
*Per Net Acre |
$23,317
$27,684
$14,196
$9,013
$6,949
$8,331
$20,388
$4,998
$19,065
$16,719 |
$23,317
$27,684
$14,196
$9,013
$6,949
$8,331
$20,388
$4,998
$19,065
$16,719 |
$23,317
$27,684
$14,196
$9,013
$6,949
$8,331
$20,388
$4,998
$19,065
$16,719 |
Plan Check
(On-Site Improvement Review) |
$120 Per Submittal
$60 Per Room Add/Alts |
$120 Per Submittal |
$120 Per Submittal |
| Tree Mitigation |
Per Municipal Code |
Per Municipal Code |
Per Municipal Code |
Sewer Expansion
Effective 07/01/08 |
$4,673 Per Unit |
$4,673 Per EDU |
$4,673 Per EDU |
| Sewer Connection |
$876.61/EDU |
$876.61/EDU |
$876.61/EDU |
| Sewer Connect Permit |
$25 Per Connection |
$25 Per Connection |
$25 Per Connection |
| Sewer Deposit |
N/A |
$60.24 Per Billing Acct |
$60.24 Per Billing Acct |
| Landscape Plan Check |
$400 Per Plan Sheet |
$400 Per Plan Sheet |
$400 Per Plan Sheet |
| Landscape Efficient |
$90 +$10 Per Acre >5 |
$90 +$10 Per Acre >5 |
$90 +$10 Per Acre >5 |
| Landscape Inspection |
$60 Per SFD |
5% of Install Cost |
5% of Install Cost |
Flood Control Fee:
A. San Sevine
B. Etiwanda |
$4405 Per Net Acre
$9790 Per Net Acre |
$4405 Per Net Acre
$9790 Per Net Acre |
$4405 Per Net Acre
$9790 Per Net Acre |
Environmental
| Storm Water Compliance Fee |
All New Construction (Inspection) |
| Low Priority: Less than 5 acres |
$350.00 |
|
|
| Medium Priority: 5 acres, but less than 50 acres |
$700.00 |
|
|
| High Priority: Greater than 50 acres |
$1,400.00 |
|
|
| Non-Compliance Re-Inspection Fee |
$75.00 |
|
|
| Storm Water Plan Check (SWQMP) |
All New Construction |
| Low Priority: 0 acre to 5 acres |
$450.00 |
|
|
| Medium Priority: 5 acres to 50 acres |
$900.00 |
|
|
High Priority: Greater than 50 acres, or discharge
directly to storm drain |
$1,350.00 |
|
|
• Check
With Environmental Health for all other applicable fees
School: See School District For All Applicable
Fees
|
|
|