Cherry Ave. at Victoria Ave. Traffic Signal
Project Description

Installation of a temporary traffic signal at this intersection which is currently controlled by a three-way stop. In the future, this signal will be removed as Victoria St. will ultimately be realigned to Walnut St. as part of the West Gate Specific Plan. 

  • Project Status: Pre-Construction
  • Anticipated Project Completion: Summer 2016
  • Project Necessity: To increase pedestrian and vehicular safety and to relieve heavy vehicular congestion during peak hours.

Cherry at Victoria

For More Information
If you have any questions on this project, please contact the Engineering Department via email or at (909) 350-7610.