Sierra Avenue at Metrolink At-Grade Crossing
Project Status
Sierra at metrolink photo.jpg
This project will construct sidewalk, curb and gutter on both sides of Sierra Avenue at the Metrolink crossing, widen Sierra Avenue within existing Southern California Regional Rail Authority (Metrolink) right-of-way, install pedestrian crossing gates and swing gates that meet new California Public Utility Commission requirements, and install Class III bike lane signage.

  • Project status - Design
  • Anticipated project completion - September 2017

Sierra at Metrolink close up map.jpg